Posted by
on June 11, 2019.Last updated by
on June 11, 2019.Burn the Sickness Out is the second and final mission in the Water Treatment Plant agent mission chain. The previous mission is A Cause for Concern.
Burn the Sickness Out |
---|
Difficulty: ♦️5 |
A water treatment facility in Victoria, British Columbia was contaminated by Filth-tainted fungal spores, infecting a large number of the population with a strange outbreak. An agent is needed to enter the plant and kill the infectious fungi. Perhaps you have an agent who loves to play with fire... |
Mission Requirements |
|
---|---|
Stats |
|
△ Prowess | 250 |
◻ Adaptability | 0 |
❍ Ingenuity | 0 |
Cost |
|
Intel | 0 |
Supplies | 10 |
Assets | 0 |
Duration |
|
Time | 04:00:00 |
Potential Rewards |
|
---|---|
Item Rewards |
|
Weapon Distillate (750cc) | Requires Successful or Outstanding Results |
Glyph Distillate (750cc) | Requires Outstanding Results |
Resource Rewards |
|
Intel | 0 |
Supplies | 0 |
Assets | 8 |
XP | 2,400 |
Bonus Objective |
|
---|---|
Bonus Requirements |
|
Resilience | |
Bonus Rewards |
|
Weapon Distillate (375cc) |
Mission Results Text |
|
---|---|
Complete |
Your agent entered the facility, without proper protection. In an attempt to burn the fungal growth, they fell victim to its monstrous spores. |
Success |
Your agent was able to cleanse all the infectious fungal growth within the water treatment facility. Experts have since moved in, drained the tanks, and sterilized the facility. |
Outstanding Results |
Your agent was able to cleanse all the infectious fungal growth within the water treatment facility. Experts have since moved in, drained the tanks, and sterilized the facility. |